Case Study | Digital Lean Manufacturing for Industrial Products Company
A leading industrial products manufacturer in the UK engaged Consultport to implement digital lean manufacturing practices across their production processes. The client sought to streamline operations, reduce waste, and enhance productivity through advanced digital tools, aiming for a comprehensive transformation to improve overall efficiency. They required an expert consultant with extensive digital lean transformation experience to successfully guide the project.
Consultport responded quickly, presenting a shortlist of three highly qualified consultants within 48 hours. The manufacturer chose a Manufacturing Consultant with over 7 years of experience in lean transformation specifically tailored for industrial manufacturing. The consultant’s role was to design and implement a lean manufacturing strategy integrating real-time data and predictive analytics, ensuring optimized and waste-reduced production processes.
The consultant’s approach focused on integrating real-time data and predictive analytics to drive the digital lean transformation:
- Real-Time Monitoring: They began by implementing IoT sensors across the production floor to track machinery, inventory levels, and production cycles in real time. This data was centralized within an ERP system, giving the client immediate visibility into key performance metrics and enabling quick adjustments to boost efficiency.
- Workflow and Inventory Optimization: The consultant developed digital Kanban systems to optimize workflow and manage inventory, ensuring that materials were available “just in time” for production.
- Predictive Maintenance: To further enhance operations, predictive maintenance algorithms were integrated using machine learning to detect potential equipment failures before they occurred, significantly reducing downtime.
- AI-Driven Simulations: By employing AI-driven simulations, the team could analyze production bottlenecks and test process adjustments virtually, ensuring an optimal production flow without disrupting ongoing operations.
After one year of the project’s conclusion, the client reported substantial improvements in their manufacturing activities to better meet production demands and improve profitability.

"*" indicates required fields